MA-PMT tests at Tsukuba
Tube/channel responses for a fixed HV (e.g. 900V).
Arches :
SE -
SW -
NW -
NE
Format: 3 lines per tube.
line 1: West=0/east=1, wedge(0-23), cable(A:D=1:4),
PMT production batch#, Sp/100=anode sensitivity, data sheet page#, entry#.
line 2: Relative uniformity within the tube, ch 1 - 8.
line 3: channels 9 - 16.
CAEN supply on the first floor.
8 modules in crate 0 -7.
NW: 0-1, SW:2-3, NE:4-5, SW:6-7.
Each module has 24 channels, 0 - 23.
-
Temperature dependence of anode output (QE times gain) :
plots
1 -
2
Last modified: Wed Apr 27 13:40:01 JST 2005